The Edge Trim Specialist
KP2000
The first choice for active edge-trim extraction: handles film speeds of up to 800 m/min reliably — directly beside the line or on the far side of the production hall.
800 m/min
200 kg/h
2×
01 — Technical Data
The KP2000 datasheet.
Edge-trim speed
up to 800 m/min, both edge trims from one slitting line
Throughput
up to 200 kg/h · depending on material, density and infeed
Infeed
direct connection or hopper; internal hopper optional
Installation
at the line or flexibly in the production hall
Connection
400 V, 3~, N, PE, 50 Hz · back-up fuse approx. 63 A
Power consumption
max. 31.6 kW
Control system
digital control and temperature regulation, touch panel (Siemens S7-1214C)
Bar dimensions
150 × 100 mm, stackable
Dimensions (L × W × H)
2600 × 2000 × 2655 mm
Weight
approx. 950 kg (base machine) · 1150 kg with base frame
Active edge trim extraction with substantial performance reserves
A central extraction system can be dispensed with entirely
Flexible installation — at the line or anywhere in the hall
Considerable reduction in disposal costs
Suitable for virtually all films and laminates
Typical Application: Blown film extrusionCast filmCutting & winding linesFlexographic printing
02 — Equipment & Safety
Equipment and Safety of the KP2000
Features
- Siemens control system
- Recipe management for different film types
- Maintenance counter for predictive servicing
- Standard and reduced-output modes for flexible production phases
- Password-free access via key switch
- Touch-based control with a clear status display
- Modular design for easy adaptation to individual requirements
- Tower light
- Fire detector
- Interlocked housing panels, accessible only with special keys
- Hazardous machine components housed internally
Ideal For
- Companies with medium to large film volumes
- Direct connection to cutting, extrusion, or printing lines
- Standalone operation or integration into existing production lines
03 — Engineering in Detail
Built to last.
04 — Other Models
One size smaller or larger?
The same compaction principle in a different performance class — from the collection point downstream of the extraction system to the coextrusion line.